Northampton Borough Council
Northampton Borough Council

Hardingstone Sustainable Urban Extension (SUE)

Hardingstone Sustainable Urban Extension Planning Application

Refused permission 15 May 2014, an appeal was lodged with the Planning Inspectorate by the Homes & Communities Agency against the Council's refusal of the planning application and the appeal was dealt with by Public Inquiry. Documents relating to the appeal can be viewed through the link below.

The appeal was allowed by the Secretary of State on the 29 February 2016, the DCLG notice can be downloaded through the link below.

Secretary of State’s Amended Appeal Decision

The appeal decision was re-issued on 14 April 2016 to take account of a correction made to Condition 17 of the decision. The associated Inspectorate letters and a corrected decision can be downloaded through the link below.


Secretary of State's Amended Appel Decision - PINS Addendum Report(PDF 105KB)
Request for Decision correction(PDF 642KB)
DCLG corrected appeal letter (PDF 81KB)
DCLG Slip-Rule Letter concerning Hardingstone Condition 17 (PDF 31KB)

Hardingstone Sustainable Urban Extension Planning Application N/2013/0338

Planning Application Application Form
Correspondence Cultural Heritage Response, March 2014
Springs Response, March 2014
HCA Letter, March 2014
Plans Site Location Plan
Indicative Masterplan
SKO1
SKO2
SKO4
SKO5
Revised Parameter Plans, March 2014
Urban Structure and Legibility Framework Parameter Plan, March 2014
Design & Access Statement Part 1
Part 2
Environmental Impact Assessment Volume 1 Non Technical Summary
Appendix 1: Geology
Environmental Statement Environmental Impact Assessment Volume 2: Written Statement
Appendix 12 Ground Investigation Note
Appendix B1: (Alternative Development Options) and B2 (Scoping Report)
Appendix B3: Scoping Opinion
Appendix B3: Scoping Opinion Request
Appendix B3: Scoping Consultation
Appendix C1: Flood Risk Assessment
Appendix C2: Anglian Water Report
Appendix D: Archaeological Study
Appendix E1: Extended Phase 1 Survey Report
Appendix E3: Wootton Dormouse Survey Report
Appendix E4: Bat Survey Report
Appendix E5: Great Crested Newt Report
Appendix E6: Final Wootton Reptile Survey
Appendix F Landscape and Visual Assessment
Appendix G Air Quality
Appendix H Noise
Appendix I.1 Envirocheck Report Information
Appendix I.1 Envirocheck Maps (1 of 16)
Appendix I.1 Envirocheck Maps (2 of 16)
Appendix I.1 Envirocheck Maps (3 of 16)
Appendix I.1 Envirocheck Maps (4 of 16)
Appendix I.1 Envirocheck Maps (5 of 16)
Appendix I.1 Envirocheck Maps (6 of 16)
Appendix I.1 Envirocheck Maps (7 of 16)
Appendix I.1 Envirocheck Maps (8 of 16)
Appendix I.1 Envirocheck Maps (9 of 16)
Appendix I.1 Envirocheck Maps (10 of 16)
Appendix I.1 Envirocheck Maps (11 of 16)
Appendix I.1 Envirocheck Maps (12 of 16)
Appendix I.1 Envirocheck Maps (13 of 16)
Appendix I.1 Envirocheck Maps (14 of 16)
Appendix I.1 Envirocheck Maps (15 of 16)
Appendix I.1 Envirocheck Maps (16 of 16)
Appendix J: Cumulative effects

Statement of Community Involvement Part 1
Part 2
Sustainability Strategy Full Document

Transport Assessment Land South of Brackmills Transport Assessment (revised January 2014)
Appendix 1: Figures (revised January 2014)
Appendix 2: Personal Accident Data (revised January 2014)
Appendix 3: Framework Travel Plan (revised January 2014)
Appendix 4: Traffic Counts (revised January 2014)
Appendix 5: Trip Generation (revised January 2014)
Appendix 6: ARCADY (revised January 2014)
Appendix 7: Queen Eleanor Traffic Counts (revised January 2014)
Appendix 8: PICADY (revised January 2014)
Appendix 9: LINSIG Queen Eleanor/Brackmills Interchange (revised January 2014)
Appendix 10: Landimore Rd Mitigation Design Proposals(revised January 2014)
Appendix 11: Caswell Road Roundabout Mitigation (January 2014)
Appendix 12: Queen Eleanor Interchange Mitigation (January 2014)
Appendix 13: Brackmills Interchange Mitigation (January 2014)
Appendix 14: Highways Agency NGMS Correspondence (January 2014)
Technical Note TN02 (January 2014)
Land South of Brackmills Transport Assessment (superseded)
Appendix 1: Figures (superseded)
Appendix 2: Personal Accident Data (superseded)
Appendix 3: Framework Travel Plan (superseded)
Appendix 4: Traffic Counts (superseded)
Appendix 5: Trip Generation (superseded)
Appendix 6: ARCADY (superseded)
Appendix 7: Queen Eleanor Traffic Counts (superseded)
Appendix 8: PICADY (superseded)
Appendix 9: Landimore Road Mitigation (superseded)
Appendix 10: Highways Agency Correspondence (superseded)

Tree Survey Full Document

Return to Planning Home Page