Northampton Borough Council
Northampton Borough Council

Avon Nunn Mills Planning Application

To comment on the application you will need to enter the application number N/2013/0333 (this can be copied and pasted into the form). The link will open in a new window.

Once you have entered the application number, click on "Search".  Then select the "Comment" tab (top right-hand corner).

Other correspondence relating to the application may be viewed by clicking the "Documents" tab.

For ease of access, links to the principal documents are listed below.

Avon Nunn Mills Planning Application N/2013/0333

Application Form Application Form

Planning Statement Planning Statement (March 2013)

Design & Access Statement Contents Page and Sections 1 - 5
Section 6
Sections 7 and 8

Plans Site Location Plan
Land Use Parameter Plan
Movement and Access Parameter Plan
Building Height Parameter Plan
Environmental Statement Non Technical Summary (March 2013) Complete Document

Environmental Statement Preface
Contents
Non Technical Summary
Chapter 1 - Introduction
Chapter 2 - EIA Process
Chapter 3 - Description of Proposed Development
Chapter 4 - Site and Surrounding Environment
Chapter 5 - Planning Policy Context
Chapter 6 - Socio-economics
Chapter 7 - Waste Management
Chapter 8 - Ground Conditions and Contamination
Chapter 9 - Hydrology and Drainage
Chapter 10 - Ecology and Nature Conservation
Chapter 11 - Landscape and Visual Effects
Chapter 12 - Cultural Heritage and Archaeology
Chapter 13 - Traffic, Transportation and Access
Chapter 14 - Noise and Vibration
Chapter 15 - Air Quality
Chapter 16 - Summary of Effects
List of Appendices
List of Appendices - Volume 2A
List of Appendices - Volume 2B
List of Appendices - Volume 2C
List of Figures
Figure 1.1
Figure 1.2
Figure 4.1
Figure 6.1a
Figure 6.1b
Figure 6.1c
Figure 6.2
Figure 11.1
Figure 11.2
Figure 11.3
Figure 11.4
Figures 11.5a - 11.5h
Figure 14.1
Figure AQ1
Figure AQ2
Figure AQ3
Figure AQ4
Figure AQ5
Figure AQ6
Figure AQ7
Figure AQ8
Figure AQ9
Figure AQC1
Figure AQC2
Figure AQC4
Figure P.062617-4
Figure P.062626-4
Figure P.06267-4.5
Figure P.084710-A
Figure P.084711-C
Figures 12.1 - 12.7
Appendix 1 - Location Plan
Appendix 2 - Topographical Survey - Part 1 of 2
Appendix 2 - Topographical Survey - Part 2 of 2
Appendix 2.1 - Scoping Table
Appendix 3 - Indicative Masterplan
Appendix 4 - Flood Defences
Appendix 4 - Flood Mapping
Appendix 5 Part 1 of 3
Appendix 5 Part 2 of 3
Appendix 5 Part 3 of 3
Appendix 5 Part i of ii
Appendix 5 part ii of ii
Appendix 8.1 - Phase 1 Environmental Study
Appendix 9.1 Flood Risk Assessment (FRA)
Appendix 10.1.1 - Baseline Ecological Site Audit
Appendix 10.1.10 - Over-wintering and bird survey report
Appendix 10.1.2 - Phase 2 - Habitat Phytosociological Report
Appendix 10.1.3 - Bat Survey
Appendix 10.1.4 - Otter and Water Vole Survey
Appendix 10.1.5 - Reptile Survey
Appendix 10.1.6 - Biodiversity Management Plan
Appendix 10.1.7 - Entomological Scoping Report and Review
Appendix 10.1.8 - Subterranean Voids Bat Report
Appendix 10.1.9 - Abandoned Railway Baseline Ecological Site Audit
Appendix 11.1 - Tree survey
Appendix 12.1 - Gazetteer of Heritage Assets
Appendix 12.2 - Historic Building Recording
Appendix 14.1 - Full Attended and Unattended Measurement Detail
Appendix 14.2 - Noise output from existing substation
Appendix 14.3 - Construction Noise Calculations
Appendix 14.4 - Traffic Noise Assessment
Appendix 15.1 - Air Quality Assessment

Transport Assessment (March 2013) Pages 1-25
Pages 26-50
Pages 51-100
Pages 101-150
Pages 151-200
Pages 201-250
Pages 251-300
Pages 301-350
Pages 351-400
Pages 401-500
Pages 501-600
Pages 601-750
Pages 751-850
Pages 851-937
Travel Plan Framework Travel Plan (March 2013)

Other Reports Commercial Justification for Office Provision (February 2013)
Consultation Report (March 2013)
Green Infrastructure Strategy (March 2013)
Phase 1 Drainage and Utilities Assessment
Retail Statement
Sustainability Statement (March 2013)

Return to Planning Home Page